The Repairs Have Been Completed
Position: 35,1.90S , 117,53.16E
Speed: 0 knots, Course: 152 deg.
The repairs to the Black Pearl have been completed and she will leave the dock in Albany within the hour. It will then take her 1 more hour to reach the point at which she suspended racing yesterday. From that point in time, she will be racing toward Melbourne.
Today has been a very busy day in Albany fabricating and fitting new parts.
The Pirates would like to give a special thanks to Paul Terry, Ray Woonings of Wallace Engineering and his entire team, and Eleanor Hay of Movistar who helped us get sorted out with accommodation when we arrived late last night.
The trip to Melbourne should take about 5 days.
Paul
Pirates of the Caribbean